The $3 Billion Plan to Turn Hoover Dam Into a Giant Battery

July 25, 2018

The Los Angeles Department of Water and Power, an original operator of the dam when it was erected in the 1930s, wants to equip it with a $3 billion pipeline and a pump station powered by solar and wind energy. The pump station, downstream, would help regulate the water flow through the dam’s generators, sending water back to the top to help manage electricity at times of peak demand.